Level 2 home charging installed in Kaysville on a permitted, correctly sized 240-volt circuit — with the load calculation that tells you honestly whether your panel can take it.
A home charger is a simple job when the panel has room and a real project when it does not, and the only way to know which one you have is a load calculation. Kaysville mixes genuinely old Main Street and Angel Street homes with 1990s and newer bench subdivisions. The older side of town is where the fuse boxes and ungrounded circuits still live.
Kaysville mixes genuinely old Main Street and Angel Street homes with 1990s and newer bench subdivisions. The older side of town is where the fuse boxes and ungrounded circuits still live. Here is what that means on the ground.
Utah winters are the reason to size this correctly rather than minimally. Cold reduces battery efficiency, which means longer sessions at full current, and a circuit sized to the bare minimum is the one that gets warm every January.
Kaysville runs its own municipal power department, which changes who we call for the disconnect but not what you have to do. We install home charging across Kaysville and Davis County, including Cherry Hill and Barnes Park, and the load calculation comes before the quote every time.
240-volt circuits for Tesla Wall Connectors and universal J1772 and NACS units, sized to the charger and the run.
We calculate the existing load against your service before quoting, so nobody discovers the problem after the drywall is open.
When the service genuinely cannot carry the charger, we quote the upgrade and the charger together rather than in two surprises.
Some homes are better served by a load-management device than a full service upgrade. We will tell you when that is the cheaper honest answer.
Voltage drop on a long run is the thing most often done wrong. We size the conductor for the distance, not just the amperage.
Two chargers on one service takes planning, and sometimes load sharing, to do without oversizing everything.
Permits: we pull the Kaysville electrical permit where the work requires one and schedule the inspection.
Power company: Kaysville City Power (municipal). We coordinate the meter disconnect and reconnect with the city.
Local conditions: Kaysville runs its own municipal power department, which changes who we call for the disconnect but not what you have to do.
You never deal with the city or the utility. That is our job.
We work throughout Kaysville and Davis County, including Cherry Hill and Barnes Park.
Often yes on a 200-amp service, and often not on a 100-amp service already running central air and electric appliances. The load calculation gives a definite answer, and we do it before quoting rather than after.
Yes — a new 240-volt circuit is permitted work. We pull the Kaysville electrical permit and schedule the inspection as part of the installation.
Tesla Wall Connectors and universal J1772 and NACS units from the major manufacturers. If you already bought a charger we will install it; if you have not, we will tell you what actually matters in the choice.
Utah winters reduce battery efficiency, which means longer charging sessions and more hours at full current. That is an argument for sizing the circuit correctly rather than to the minimum.
Yes. The run length drives the conductor size and the cost, and it is where corner-cutting shows up as a charger that throttles or trips. We size it properly.
Run the numbers yourself with our free EV charger, panel-upgrade, energy and generator calculators. No email required.
Licensed, insured and ready now. Free estimates, upfront pricing, five-year warranty.