Level 2 home charging installed in Perry on a permitted, correctly sized 240-volt circuit — with the load calculation that tells you honestly whether your panel can take it.
A home charger is a simple job when the panel has room and a real project when it does not, and the only way to know which one you have is a load calculation. Perry runs from old orchard property along Fruit Way to newer building on the bench, and the older places often still have outbuildings fed by whatever was handy at the time.
Perry runs from old orchard property along Fruit Way to newer building on the bench, and the older places often still have outbuildings fed by whatever was handy at the time. Here is what that means on the ground.
Utah winters are the reason to size this correctly rather than minimally. Cold reduces battery efficiency, which means longer sessions at full current, and a circuit sized to the bare minimum is the one that gets warm every January.
We confirm the serving utility before scheduling any meter work here, because the boundary through this stretch of Box Elder County is not obvious from the street. We install home charging across Perry and Box Elder County, including Fruit Way and the mouth of Perry Canyon, and the load calculation comes before the quote every time.
240-volt circuits for Tesla Wall Connectors and universal J1772 and NACS units, sized to the charger and the run.
We calculate the existing load against your service before quoting, so nobody discovers the problem after the drywall is open.
When the service genuinely cannot carry the charger, we quote the upgrade and the charger together rather than in two surprises.
Some homes are better served by a load-management device than a full service upgrade. We will tell you when that is the cheaper honest answer.
Voltage drop on a long run is the thing most often done wrong. We size the conductor for the distance, not just the amperage.
Two chargers on one service takes planning, and sometimes load sharing, to do without oversizing everything.
Permits: we pull the Perry electrical permit where the work requires one and schedule the inspection.
Power company: confirmed per address — Rocky Mountain Power or the city power department. We verify it before scheduling the disconnect.
Local conditions: We confirm the serving utility before scheduling any meter work here, because the boundary through this stretch of Box Elder County is not obvious from the street.
You never deal with the city or the utility. That is our job.
We work throughout Perry and Box Elder County, including Fruit Way and the mouth of Perry Canyon.
Often yes on a 200-amp service, and often not on a 100-amp service already running central air and electric appliances. The load calculation gives a definite answer, and we do it before quoting rather than after.
Yes — a new 240-volt circuit is permitted work. We pull the Perry electrical permit and schedule the inspection as part of the installation.
Tesla Wall Connectors and universal J1772 and NACS units from the major manufacturers. If you already bought a charger we will install it; if you have not, we will tell you what actually matters in the choice.
Utah winters reduce battery efficiency, which means longer charging sessions and more hours at full current. That is an argument for sizing the circuit correctly rather than to the minimum.
Yes. The run length drives the conductor size and the cost, and it is where corner-cutting shows up as a charger that throttles or trips. We size it properly.
Run the numbers yourself with our free EV charger, panel-upgrade, energy and generator calculators. No email required.
Licensed, insured and ready now. Free estimates, upfront pricing, five-year warranty.